The Ultraviolet (UV) Disinfection Improvements project consists of the replacement of aging UV disinfection equipment nearing the end of its useful life at the City's Wastewater Treatment Facility (WWTF). UV disinfection is the final stage of the treatment process where wastewater is disinfected...
The proposed Biosolids Thermal Dryer will produce a high-quality, nutrient-rich biosolid product produced from the wastewater treatment process that will be beneficially re-used as a fertilizer or soil amendment. The project will reduce current operational costs for treatment solids disposal and...
The City's water treatment facility (WTF) was originally constructed in 1963 with several upgrades since that time. The WTF has a current capacity of 12.0 million gallons per day (mgd) with conventional water treatment process including 5-sedimentation basins, 4-multimedia gravity filters...